| 1 |
Const. of Hajat Qabool Memorial Arts and Culture Auditorium Bujayote Yasin |
Final Evaluation Report |
XEN B&R Division Ghizer |
15-01-2026 |
25-01-2026 |
|
|
| 2 |
Const/Improvement and Metaling of Internal Roads i/c Small RCC Bridges in GBA-21 (Const. of Link roads in Siliharang & Masher Area (Part-IV) |
Final Evaluation Report |
XEN B&R Division Ghizer |
15-01-2026 |
25-01-2026 |
|
|
| 3 |
Construction of Link Road in Khanbary and Dodoshal and Water Channel at Kakote Khanbary |
Final Evaluation Report |
XEN B&R Division Chilas |
22-01-2026 |
31-01-2026 |
|
|
| 4 |
Repair/Maintenance of 120ft Span Suspension Bridge at Ispay Astore |
Final Evaluation Report |
XEN B&R Division Astore |
29-01-2026 |
08-02-2026 |
|
|
| 5 |
Repair of Govt. QTR(ISI) Govt. Colony Astore |
Final Evaluation Report |
XEN B&R Division Astore |
29-01-2026 |
08-02-2026 |
|
|
| 6 |
General Overhauling of Wheel Dozer Kamatsu WA-200-I/Tractor (4x4) |
Final Evaluation Report |
XEN B&R Division Astore |
02-02-2026 |
12-02-2026 |
|
|
| 7 |
General Overhauling of Wheel Dozer Kamatsu WA-200-I/Tractor (4x4) |
Final Evaluation Report |
XEN B&R Division Astore |
02-02-2026 |
12-02-2026 |
|
|
| 8 |
Construction of Additional Calssrooms and acquisition of Land at Barmas Pain Gilgit |
Final Evaluation Report |
Executive Engineer Works(Education) Gilgit Division |
03-02-2026 |
13-02-2026 |
|
|
| 9 |
Re-Construction of depilated Building BHS Nomal Up-Gradation of High School Nomal (Changed nomenclature) |
Final Evaluation Report |
Executive Engineer Works(Education) Gilgit Division |
03-02-2026 |
13-02-2026 |
|
|